Poracle

§ 403.1.b Core Rules PDF (officieel)

laatst bijgewerkt 17-7-2026

§ 403 3. Determine Total Cost

§ 403.1 Determine the base cost of the Ability.

Triggered Abilities will typically not have a base cost associated with them when placed on the chain due to their conditions. 1. If a Triggered Ability has a cost within instructions (e.g. “[do X] to [do Y]”), the cost is taken as the base cost. See rule 740.2.a. for more information on costs within instructions.

Kaarten die op deze regel leunen

Semantisch gematcht op de sectietekst — kaarten waarvan de tekst het dichtst bij deze regel ligt.